Skip to content Skip to Search
Skip navigation

COVID-19 restrictions in UAE to loosen from Wednesday

Women in face masks WAM
Face masks are still mandatory in certain settings such as medical facilities, but otherwise optional

The UAE will ease COVID-19 restrictions nationwide from Wednesday, September 28, according to WAM, the Emirates’ state-owned news agency.

The COVID-19 daily cases announcement will be discontinued because of the significant recovery seen across the country, said Dr. Saif Al Dhaheri, spokesperson for the National Emergency Crisis and Disasters Management Authority.

However, the green pass system is being updated: it will require vaccinated people and exempted individuals to take a PCR test once a month to maintain their green status. Unvaccinated individuals must take the test every seven days, he added.

The green pass system remains a prerequisite for employees and visitors to enter federal authorities and entities. It is also being expanded to cover workers in the tourism and economic sectors.

Where are face masks still required?

Face masks are still mandatory in medical facilities, mosques and public transportation, as well as for food service providers, injured and suspected cases.

Otherwise, wearing masks is optional for all other open and closed facilities and spaces, Al Dhaheri said.

In mosques and places of worship, precautionary procedures have been reduced, and social distancing for worshipers has been cancelled, the official added. Wearing face masks remains mandatory.

The tourism sector, including hotels and their facilities, parks and recreational spaces, and the economic sector, such as malls and shops, in addition to various events, are vital and active sectors; therefore, the updated green pass requirements must be met to be allowed entry.

Air travel and pre-departure testing

The aviation sector will adopt precautionary measures in line with the national aviation protocol, he said, with airlines deciding whether face masks will be mandatory or optional on planes.

The requirements for pre-departure testing for vaccinated and unvaccinated people will be determined based on the needs of their travel destinations.

For those coming to the UAE, the current protocol remains applicable to both vaccinated and unvaccinated people.

The safety measures will be adopted in line with the national education protocol, and wearing face masks in open and closed spaces will be optional. The new green pass requirements will be applicable.

A reduction in the isolation period

The isolation period for positive cases is being reduced to five days, for both home and institutional isolation. Employers are to take responsibility for institutional isolation measures, for example in worker housing cities.

People who come into contact with confirmed cases must take a PCR test if they show any symptoms, Al Dhaheri said. Those in vulnerable groups should take a PCR test and monitor their condition for seven days.

The updated procedures are part of the initial phase for easing restrictions, with further updates to be announced regularly. The situation is stable in the country, Al Dhaheri added, and infections are declining.  

Latest articles

Alstom's upgraded passenger transit system will help reduce emissions at King Abdulaziz International Airport

Alstom to upgrade driverless transit system at Jeddah airport

French train maker Alstom will upgrade the automated and driverless passenger transit system at King Abdulaziz International Airport, as the Jeddah airport aims to receive 114 million passengers by 2030. As part of the contract, Alstom will design, engineer, supply, integrate, test and commission a complete system upgrade of its Innovia automated people mover (APM) at the airport’s terminal […]

The Al Dhafra solar PV project. Ewec plans to increase Abu Dhabi’s solar production capacity to 7.6 GW by 2030

Abu Dhabi to generate 50% power from green sources by 2030 

Abu Dhabi plans to generate more than half of its electricity from renewable and clean energy by 2030, a senior Emirates Water and Electricity Company (Ewec) official has said. The state-owned entity is increasing the emirate’s solar energy production plan to 7.6 gigawatts (GW) by 2030, the UAE state-run Wam news agency reported, quoting CEO Othman Juma […]

An Acwa Power solar facility in Saudi Arabia. The Bank Of China loan will help finance its solar projects in Uzbekistan

Acwa Power takes China bank loan in first for Saudi Arabia

Saudi energy major Acwa Power has secured an $80 million loan from the Bank of China as the appeal of the Chinese Renminbi as a trade currency gains traction in the GCC. Acwa Power, the world’s largest private water desalination company and a first mover into green hydrogen, has received the equity bridge loan to […]

Solar power panel

Cost of Xlinks Morocco-UK project balloons by a third

The cost of an ambitious project to deliver green energy from the south of Morocco to power homes in the UK has ballooned by more than a third to $30 billion. Xlinks First is behind the Morocco-UK renewables project, which would construct the world’s longest high-voltage direct current (HVDC) subsea power cable between the North […]